de en
Stefan Müller-Naumann1
Stefan Müller-Naumann2
Stefan Müller-Naumann3
Stefan Müller-Naumann4
Stefan Müller-Naumann5

Poing secondary school, Germany

Object Type
Schools

Client
SKE Facility Management GmbH, Mannheim

Architects
Fritsch + Tschaidse Architekten GmbH, München

Completion
2012

Expertises
Building Acoustics
Sound Isolation
Room Acoustics
Acoustic Measurements

Designed as a PPP project in passive house standard, the Poing secondary school was built close to the existing schools and forms a school center together with them. The focal point of the school is the large assembly hall, which extends over several floors and is used both as a place for pupils to spend time and as a venue for events. A bright and open atmosphere invites pupils to linger, while at the same time the upper floors, where the classrooms and specialist rooms are located, are accessed via side staircases.

Particular attention was paid to the building and room acoustics, especially in the central assembly hall and in the adjoining multi-purpose and music rooms. Targeted sound-absorbing measures in the ceiling and wall areas enable the desired multifunctional range of uses for the auditorium. Due to the location of the building next to a residential area, immission control aspects regarding the use of the sports hall in the evenings and the parking spaces also had to be taken into account. The quality of the construction work was verified by means of extensive acceptance measurements, both in terms of noise and indoor air conditions.

Image Copyright
1 Stefan Müller-Naumann
2 Stefan Müller-Naumann
3 Stefan Müller-Naumann
4 Stefan Müller-Naumann
5 Stefan Müller-Naumann

Similar Projects