Congress Center Hamburg, Germany
Object Type
Townhalls & Congress
Builder
CCH Immobilien GmbH, vertreten durch Sprinkenhof GmbH
Architekten
Tim Hupe Architekten und Agn Leusmann, Hamburg
Completion
2022
Expertises
Building Acoustics
Room Acoustics
After eight years of comprehensive refurbishment, the new CCH Congress Center Hamburg resumed operations in April 2022. The heritage-listed event complex had been extensively modernized, expanded, and equipped with state-of-the-art technology for a multi-purpose and highly flexible type of usage. The new representative foyer provides a barrier-free access to the numerous halls and conference rooms via escalators and elevators.In the entire building, a high level of structural sound insulation was realized for ensuring the un-restricted simultaneous usage of all halls and conference areas. Moreover, the focus was on attaining a good speech intelligibility in the numerous event and conference rooms. The large glazed foyer was optimized both in terms of room acoustics and building clima-tology. In this connection, extensive simulations were performed for the thermal conditions prevailing in summer and winter. MÜLLER-BBM Building Solutions was responsible for the conceptual design of the entire structural thermal insulation including the EnEV 2014 certificates (German Energy Saving Ordinance). A DGNB (German Sustainable Building Council) certification in Gold was achieved for the complex. During the process, MÜLLER-BBM Building Solutions provided consultancy for all aspects of thermal insulation, sound insulation, acoustic comfort, and for compiling the certificates.
Image Copyright
1 Michael Zapf
2 MBBM-BSO
3 MBBM-BSO